This automation helps quality teams verify the first piece of every run and hold production until it passes spec.
What's Included
- FAI checklist: Inspectors record dimensions and features against the drawing.
- Sign-off routing: Results move to quality engineering for approval.
- Production gate: The run stays on hold until the first article is approved.
- FAI record: Each inspection is stored against the part and revision.
How To Use
- Build the FAI checklist from the part drawing and spec.
- Inspect the first piece of each new run.
- Route results for sign-off before full production starts.
- Release the run once the first article is approved.
Pair this with a quality engineering agent and browse manufacturing automations to start every run right.
