Guessing quantities means a second trip or a shed full of leftovers. This turns measurements into a costed list with the waste factor built in.
What's Included
- Measurements in, quantities out with coverage rates you control.
- A waste factor per material because ten percent on everything is a guess.
- Pack sizes rounded up honestly since you cannot buy two thirds of a tin.
- An assistant that checks the numbers against similar jobs.
How To Use
- Keep coverage rates as records. They differ by product and by surface.
- Round up to real pack sizes. That is what you will actually buy.
- Set waste per material, higher for anything cut on a diagonal.
- Save the finished job and compare against what was really used.
Price it through the material takeoff calculator, and schedule the work with field service prompts.
