download dots

🏁 Update Linear When the Work Completes with AI

A completed task reads the linked issue, updates its state, and comments with what was actually delivered.

  • Event-triggered
  • 100+ integrations
  • Branching logic
  • Schedule + monitor
UNIT · TASKADE.FLOW4 STEPS

How this flow runs

When

Task Completed

Taskade

Then 1

Get Issue

Linear

Then 2

Update Issue

Linear

Then 3

Add Comment

Linear

Build this flow with AI

Opens the builder with these steps already described. Free to start, no card.

What does this automation do?

A completed task reads the linked issue, updates its state, and comments with what was actually delivered.

What can you do with it?

  • Move the issue at the moment the work is done
  • Leave a record of what shipped rather than a bare state change
  • Remove the end-of-cycle backlog tidy-up

The Steps

This automation runs in 4 steps:

  1. When Taskade — Task Completed
  2. Then Linear — Get Issue
  3. Then Linear — Update Issue
  4. Then Linear — Add Comment

Who is this automation for?

Built for teams who finish the work and leave the issue open. A completed task reads the linked issue, updates its state, and comments with what was actually delivered.

How do you set it up?

  • Open the "Automations" tab in your workspace.
  • Click ➕ Add automation, then start from scratch.
  • Add the trigger "Task Completed" from Taskade.
  • Add the action "Get Issue" from Linear.
  • Add the action "Update Issue" from Linear.
  • Add the action "Add Comment" from Linear.
  • Enable the toggle in the top-right corner to activate the automation.

Prefer to describe it instead? Click Build this flow with AI above and Taskade wires the trigger, the steps for you.

Related from the blog