# Timeline (Inside Gantt View)

> The timeline is the horizontal scrolling component inside the Gantt Chart view. Learn how to use timeline scrolling, zoom levels, and task scheduling within Gantt.

- Source: https://www.taskade.com/learn/projects/timeline-view
- Section: Projects
- Updated: 2026-11-09
- Index of all pages: https://www.taskade.com/learn/llms.txt

> **TL;DR:** Timeline is **not** a standalone project view. It is the horizontal scrolling time-axis component inside the [Gantt Chart view](https://www.taskade.com/learn/projects/gantt-view), which sits under **More views** and needs a paid plan. Taskade has multiple project views in total. To use the timeline, open Gantt Chart from **More views**.

Here is how your tasks become bars on the timeline inside the Gantt view.

```mermaid
flowchart LR
  A[Tasks with<br/>start and end dates] --> B[Gantt view]
  B --> C[Timeline time axis]
  C --> D[Task bars you<br/>drag and schedule]
  style A fill:#0d1b2a,color:#7dd3fc,stroke:#38bdf8,stroke-width:1.5px
  style B fill:#2a1225,color:#ff8fa3,stroke:#ff2d60,stroke-width:2px
  style C fill:#0d1a0e,color:#86efac,stroke:#22c55e,stroke-width:1.5px
  style D fill:#1a140a,color:#ffb74d,stroke:#e65100,stroke-width:1.5px
```

## Timeline in the Gantt View

The timeline is the horizontal scrolling area inside the [Gantt Chart view](https://www.taskade.com/learn/projects/gantt-view) where tasks are displayed as bars along a time axis. It is not a separate project view. It is a core component of the Gantt view.

To use the timeline:

1. **Open any project**
2. **Open More views in the toolbar and pick Gantt Chart**
3. **Use the timeline**, the right-hand panel showing tasks on a time axis

---

### Timeline Features (Inside Gantt)

- **Time Scale Selector**: switch between daily, weekly, monthly, and yearly scales in the top-right corner
- **Scroll the timeline**: swipe with two fingers on your trackpad or click-and-drag with the mouse
- **Seeker Arrows**: jump to the next set of tasks on the timeline edges
- **Set task duration**: click the empty space on the timeline at the task's height level
- **Adjust duration**: hover over the edges of a task bar and drag to extend or shorten
- **Reposition tasks**: click and hold the center of a task bar, then drag left or right
- **Pinch to zoom**: zoom in for task-level detail or out for the full project overview

---

### Timeline Is Not a Separate View

Taskade provides **multiple project views**: List, Board, Table, and Mind Map as toolbar tabs, plus Docs, Gantt Chart, Calendar, Actionsheet, and Org Chart under **More views**. The timeline functionality, horizontal scheduling of tasks across a time axis, lives entirely within the Gantt Chart view. If you need a simple date-based visualization without dependencies, the [Calendar view](https://www.taskade.com/learn/projects/calendar-view) is the best alternative.

---

### Related guides

- [Gantt Chart View](https://www.taskade.com/learn/projects/gantt-view): Full guide to the Gantt view and its timeline component
- [Calendar View](https://www.taskade.com/learn/projects/calendar-view): Date-based task scheduling
- [Due Dates](https://www.taskade.com/learn/projects/due-dates): Set start and end dates for tasks
- [Project Views](https://www.taskade.com/learn/projects/project-views): All views explained